Introduction : -Construction resources needed for AE wall are : -
1. Material
a) Percast concrete facing panel & level pad
b) Anchor block
c) Reinforcing bar
d) Granular backfill material
2. Machinery
a) Excavator
b) Spreader/ bulldozer/ backhoe
c) Small compactor
d) Lorries for transporting backfill/ earth/ facing panel
e) Water pump/ robin engine
3. Supporting Tools
a) Spanner
b) Brow bar ¾”-1” diameter & 3-4 ft long
c) Hammer
d) Spirit level (3ft)
4. Accesoties
a) Wooden clamps completed wt long bolt
b) Wooden wedges